APPLICABILITY
Applicable to incorporated towns, villages, and
other governmental agencies for street and highway lighting requiring
multiple lighting units.
MONTHLY RATE
| 7,000 – 10,000 Lumens |
|
High Pressure Sodium, wood pole..........................
$10.74 |
| 7,000 – 10,000 Lumens |
|
High Pressure Sodium, metal/fiberglass pole...........
$15.46 |
| 25,000 – 30,000 Lumens |
|
High Pressure Sodium, wood pole..........................
$15.84 |
| 25,000 – 30,000 Lumens |
|
High Pressure Sodium, metal/fiberglass pole...........
$20.56 |
CONDITIONS OF SERVICE
- The above rates apply to all existing security lights and
new security lights installed on existing poles of Lane Electric.
For new poles installed by Lane Electric to support or supply
seStreet lighting equipment including lamps, fixtures, control
and supply circuits, transformers, and additional guys and
fittings will be furnished and maintained by Lane Electric.
All new and replacement light installations will use energy
efficient cutoff high pressure sodium luminaires meeting applicable
Lane County area lighting standards. Decorative or special
poles and luminaires must be approved by Lane Electric. The
cost of purchase and installation of special poles and luminaires
will be paid by the member before installation. Thereafter,
the member will pay the standard monthly equivalent light rate.
- Lamp replacements will be made by Lane Electric without
additional charge, except that damage to lamps and luminaries
resulting from vandalism shall be charged to consumer at Lane
Electric's cost as a separate item on the monthly bill for
service.
- Luminaries will be installed on existing poles
in accordance with the above charges, or new poles may be installed
to serve additional areas under the rate if, in the opinion
of Lane Electric the revenue will justify the additional investment
required.
- This schedule applies to either multiple or series
street lighting circuits. Lane Electric will determine the
type of circuit required.
- Plant changes requested by the
consumer after the original installation as agreed upon by
both parties will be billed to the consumer.
TERMS OF PAYMENT
The above charges are net and are due when the
bill is mailed. Service under this schedule is subject to the
policies and procedures adopted by Lane Electric's board of directors.
|