Typical Trench
The
trench detail is for a large joint trench. If you do not have sewer,
water or phone, the ditch can be modified to accomadate just the
facilities that will be there. |
| Typical trench detail |
|

- Before digging call for Underground locates:
(1-800-332-2344) at least 48 hours prior to digging.
- All Trenches must be a minimum of 36” deep.
- If 36” depth cannot be achieved, contact Engineering
- If Trench is to be a joint trench (shared with other utilities)
the following separations must be maintained:
- Between gas and electric lines – 24”
- Between water and electric lines – 12”
- Between sewer and electric lines – 24”
- Between communications and electric lines – 12”
- If Trench is to be power only, the ditch needs be wide enough
to accommodate the conduit, i.e. a 4” ditch-witch trench
is sufficient.
- If the Trench is dug through rough, rocky terrain, the conduit
must be bedded with a minimum of 4” of sand.
- All conduits must be Schedule 40 PVC.
- All primary conduit (7200V) must be 2” diameter with
36” radius long sweeping elbows at any 90° bend.
- Secondary (120/240V) conduit for a 200 Amp. service must
be 2” diameter, with 36”radius long sweeping elbows
at any 90° bend.
- Secondary (120/240V) conduit for a 400 Amp. service must
be 3” diameter, with 36” radius long sweeping elbows
at any 90° bend.
- There will be no more than 270° of bend (3- 90° bends
or 2- 90° & 2- 45°) in any one run of conduit,
primary or secondary, between devices.
- All Primary conduit must be proved by mandrill.
- Polypropylene pull string must be left in all conduits, primary
and/or secondary.
- Where transformers and primary or secondary junction boxes
are to be installed, specifications must be obtained from L.E.C.
Engineering Department.
- After the Trench is dug and conduit installed, call Lane
Electric Cooperative (541- 484 –1151) to have an inspection
scheduled by Operations Department.
- After the Trench and the conduit are inspected, the Trench
may be back-filled.
|